Poster Open Access
Kashif Mahmood;
Pål Grønsund;
Anastasius Gavras;
David Kennedy;
Dan Warren;
Christos Tranoris;
Andrea Fabio Cattoni;
Eleonora Cau;
Paul Muschamp
{ "description": "<p>A focus area of phase 3 of 5G PPP is the design and deployment of a 5G end-to-end facility that can demonstrate that the key 5G network KPIs can be met, and which can be accessed and used by vertical industries. This poster paper presents key guidelines to implement such a 5G end-to-end facility.</p>", "license": "https://creativecommons.org/licenses/by/4.0/legalcode", "creator": [ { "affiliation": "Telenor", "@type": "Person", "name": "Kashif Mahmood" }, { "affiliation": "Telenor", "@type": "Person", "name": "P\u00e5l Gr\u00f8nsund" }, { "affiliation": "Eurescom GmbH", "@id": "https://orcid.org/0000-0003-4496-8358", "@type": "Person", "name": "Anastasius Gavras" }, { "affiliation": "Eurescom GmbH", "@type": "Person", "name": "David Kennedy" }, { "affiliation": "Samsung", "@type": "Person", "name": "Dan Warren" }, { "affiliation": "University of Patras", "@type": "Person", "name": "Christos Tranoris" }, { "affiliation": "Keysight", "@type": "Person", "name": "Andrea Fabio Cattoni" }, { "affiliation": "Fraunhofer Fokus", "@type": "Person", "name": "Eleonora Cau" }, { "affiliation": "BT", "@type": "Person", "name": "Paul Muschamp" } ], "url": "https://zenodo.org/record/2585492", "datePublished": "2018-06-18", "@context": "https://schema.org/", "identifier": "https://doi.org/10.5281/zenodo.2585492", "@id": "https://doi.org/10.5281/zenodo.2585492", "@type": "CreativeWork", "name": "On the Design of 5G End-to-End Facility for Performance Evaluation and Use Case Trailing" }
All versions | This version | |
---|---|---|
Views | 129 | 129 |
Downloads | 166 | 166 |
Data volume | 100.3 MB | 100.3 MB |
Unique views | 124 | 124 |
Unique downloads | 157 | 157 |