Project deliverable Open Access

D2.1 Report on analysis of the requirements for MONOCLE sensors including projection of cost-savings and stakeholder feedback. Deliverable report of project H2020 MONOCLE (grant 776480)

Piera, Jaume; Rodero, Carlos; Snik, Frans; Wood, John; Jackon, Thomas; Clymans, Wim; Moelans, Robrecht; Van der Vaeren, Stanislas; Peters, Steef

Requirements for MONOCLE sensors were analysed at the start of sensor development, particularly with regard to projected cost-savings in monitoring and specific stakeholder feedback. The main inputs from stakeholders were obtained from the MONOCLE water quality monitoring survey (D9.1) and are used here to define sensor-specific development priorities, particularly with respect to purpose, performance, cost and interoperability. This document guides both the initial development of new sensors and evolution of existing prototypes to higher technological readiness levels.

Files (1.7 MB)
Name Size
D2.1_Analysis-requirements-for-sensors-cost-savings-stakeholder-feedback.pdf
md5:025e4fb6a3ec16c22622e02689edc35d
1.7 MB Download
10
11
views
downloads
All versions This version
Views 1010
Downloads 1111
Data volume 18.4 MB18.4 MB
Unique views 1010
Unique downloads 1111

Share

Cite as