Published May 5, 2016
| Version v1
Project deliverable
Open
D7.3: Report on the advantages of PHM-aware control
Description
This deliverable summarises the potential and validation of the proposed, implemented and tested control strategies within the project.
Notes
Files
D7.3.pdf
Files
(1.3 MB)
Name | Size | Download all |
---|---|---|
md5:ceb47680d46161cbd4eb527092eae251
|
1.3 MB | Preview Download |