Published May 18, 2016 | Version v1
Project deliverable Open

D2.6: Characterization and measurement techniques (update D2.4)

  • 1. FCLAB

Description

Performing FC characterizations (polarization curves and EIS) can be time consuming and even impossible (according to the type of application). Thereby, it can be critical for an online implementation of the PHM-aware controller. According to that, the aim of this deliverable is to discuss the opportunity of reducing this step by assessing the performances of the prognostics approach described in D6.2 if available data are reduced, i.e. if only few points from characterization procedures are used as for parameters initialization and updating.

Files

D2.6.pdf

Files (452.1 kB)

Name Size Download all
md5:f8aefd91e8eb9c02425f6365e871e17c
452.1 kB Preview Download

Additional details

Funding

SAPPHIRE – System Automation of PEMFCs with Prognostics and Health management for Improved Reliability and Economy 325275
European Commission