// 1G Analysis with user define detectors with V shape (45 degrees) topology

// Y2 and Y3 are user define detectors
// Y2,Y3 are in the H1 site with LCI topology (V shape 45 degrees)

1) make directories for cwb

2) generate frames for ADV ifos L1 Y2 Y3 V1
   to change the default vaules edit macro/CreateFramesNOISE.C

3) generate SGQ9 MDC frames for ifos L1 Y2 Y3 V1
   to change the default vaules edit macro/CreateFramesMDC.C

to generate all necessary stuff do "make setup"
  
to change the cwb parameters edit config/user_parameters.C

to run cwb pipeline do "make cwb"

to run ced do "make ced"

to reset the directory do "make clean"
