New TopShim run:

version = topshim 2.0.0
date = 2024-01-19
time = 12:42:32.566
command = topshim 

FINE SHIMMING

Parameters:

probe = Z104275_0392
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Iteration  1: FWHM Before= 0.9 Hz, Target= 0.3 Hz, After= 0.5 Hz
Iteration  2: FWHM Before= 0.5 Hz, Target= 0.4 Hz, After= 0.4 Hz
Iteration  3: FWHM Before= 0.4 Hz, Target= 0.3 Hz, After= 0.3 Hz
Iteration  4: FWHM Before= 0.3 Hz, Target= 0.3 Hz, After= 0.4 Hz
Iteration  5: FWHM Before= 0.4 Hz, Target= 0.3 Hz, After= 0.4 Hz
Iteration  6: FWHM Before= 0.4 Hz, Target= 0.3 Hz, After= 0.5 Hz
Slow convergence detected. Shimming was aborted.
Using the best result as the final shim state.

Lineshape quality factor (1D spectrum, spinning) = 0.475

shim changes: 
Z	-4
Z2	-8
Z3	+6
Z4	-39
Z5	+359
Z6	+98

duration = 4 min 8 sec
completed successfully
finished Fri Jan 19 12:46:40 2024


========================================================================