New TopShim run:

version = topshim 2.0.0
date = 2022-11-17
time = 08:49:32.976
command = topshim 

FINE SHIMMING

Parameters:

probe = Z104275_0392
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Iteration  1: FWHM Before= 2.5 Hz, Target= 0.4 Hz, After= 0.6 Hz
Iteration  2: FWHM Before= 0.6 Hz, Target= 0.2 Hz, After= 0.4 Hz
Iteration  3: FWHM Before= 0.4 Hz, Target= 0.3 Hz, After= 0.5 Hz
Iteration  4: FWHM Before= 0.5 Hz, Target= 0.5 Hz, After= 0.5 Hz
Iteration  5: FWHM Before= 0.5 Hz, Target= 0.4 Hz, After= 0.3 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.413

shim changes: 
Z	-67
Z2	-2
Z3	+108
Z4	-252
Z5	-1815
Z6	+1005

duration = 3 min 4 sec
completed successfully
finished Thu Nov 17 08:52:35 2022


========================================================================