
New TopShim run:

version = topshim 2.0.0
date = 2022-12-12
time = 16:40:39.187
command = topshim 

FINE SHIMMING

Parameters:

probe = Z104275_0392
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Iteration  1: FWHM Before= 1.6 Hz, Target= 0.2 Hz, After= 0.4 Hz
Iteration  2: FWHM Before= 0.4 Hz, Target= 0.3 Hz, After= 0.6 Hz
Iteration  3: FWHM Before= 0.6 Hz, Target= 0.4 Hz, After= 0.7 Hz
Iteration  4: FWHM Before= 0.7 Hz, Target= 0.4 Hz, After= 0.4 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.503

shim changes: 
Z	-91
Z2	+568
Z3	-407
Z4	+1206
Z5	+166
Z6	+16776

duration = 2 min 43 sec
completed successfully
finished Mon Dec 12 16:43:21 2022


========================================================================
