
New TopShim run:

version = topshim 2.0.0
date = 2022-12-12
time = 13:27:35.476
command = topshim 

FINE SHIMMING

Parameters:

probe = Z104275_0392
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Iteration  1: FWHM Before= 0.5 Hz, Target= 0.2 Hz, After= 0.5 Hz
Iteration  2: FWHM Before= 0.5 Hz, Target= 0.3 Hz, After= 0.4 Hz
Iteration  3: FWHM Before= 0.4 Hz, Target= 0.2 Hz, After= 0.4 Hz
Iteration  4: FWHM Before= 0.4 Hz, Target= 0.3 Hz, After= 0.4 Hz
Iteration  5: FWHM Before= 0.4 Hz, Target= 0.4 Hz, After= 0.4 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.472

shim changes: 
Z	+75
Z2	+85
Z3	+28
Z4	+972
Z5	+1358
Z6	-188

duration = 3 min 0 sec
completed successfully
finished Mon Dec 12 13:30:34 2022


========================================================================
