New TopShim run:

version = topshim 2.0.0
date = 2022-01-20
time = 18:20:19.506
command = topshim 

FINE SHIMMING

Parameters:

probe = Z104275_0392
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Iteration  1: FWHM Before= 4.3 Hz, Target= 0.4 Hz, After= 0.9 Hz
Iteration  2: FWHM Before= 0.9 Hz, Target= 0.3 Hz, After= 0.8 Hz
Iteration  3: FWHM Before= 0.8 Hz, Target= 0.2 Hz, After= 1.1 Hz
Iteration  4: FWHM Before= 1.1 Hz, Target= 0.5 Hz, After= 0.4 Hz
Iteration  5: FWHM Before= 0.4 Hz, Target= 0.3 Hz, After= 0.7 Hz
Iteration  6: FWHM Before= 0.7 Hz, Target= 0.4 Hz, After= 0.4 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.481

shim changes: 
Z	-329
Z2	-299
Z3	-558
Z4	-2963
Z5	-3401
Z6	-988

duration = 3 min 41 sec
completed successfully
finished Thu Jan 20 18:23:59 2022


========================================================================