
New TopShim run:

version = topshim 2.3.0
date = 2023-10-02
time = 12:50:29.491
command = topshim 

FINE SHIMMING

Parameters:

probe = Z151574_0146
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Iteration 1: FWHM Before=12.6 Hz, Target= 0.6 Hz, After= 0.6 Hz
Iteration 2: FWHM Before= 0.6 Hz, Target= 0.3 Hz, After= 1.0 Hz
Iteration 3: FWHM Before= 1.0 Hz, Target= 0.9 Hz, After= 0.8 Hz
Iteration 4: FWHM Before= 0.8 Hz, Target= 0.6 Hz, After= 0.8 Hz
Iteration 5: FWHM Before= 0.8 Hz, Target= 0.6 Hz, After= 0.5 Hz
Iteration 6: FWHM Before= 0.5 Hz, Target= 0.6 Hz, After= 0.7 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 1.26

shim changes: 
Z	+165
Z2	+27
Z3	+51
Z4	+9
Z5	+28

duration = 1 min 26 sec
completed successfully
finished Mon Oct  2 12:51:54 2023


========================================================================
