
New TopShim run:

version = topshim 2.0.0
date = 2021-11-09
time = 10:01:05.672
command = topshim 

FINE SHIMMING

Parameters:

probe = Z104275_0392
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Iteration  1: FWHM Before= 9.0 Hz, Target= 0.5 Hz, After= 0.7 Hz
Iteration  2: FWHM Before= 0.7 Hz, Target= 0.3 Hz, After= 1.4 Hz
Iteration  3: FWHM Before= 1.4 Hz, Target= 0.3 Hz, After= 1.8 Hz
Iteration  4: FWHM Before= 1.8 Hz, Target= 0.3 Hz, After= 0.4 Hz
Iteration  5: FWHM Before= 0.4 Hz, Target= 0.4 Hz, After= 1.4 Hz
Iteration  6: FWHM Before= 1.4 Hz, Target= 0.2 Hz, After= 1.5 Hz
Iteration  7: FWHM Before= 1.5 Hz, Target= 0.3 Hz, After= 0.9 Hz
Iteration  8: FWHM Before= 0.9 Hz, Target= 0.4 Hz, After= 1.9 Hz
Iteration  9: FWHM Before= 1.9 Hz, Target= 0.5 Hz, After= 0.5 Hz
Iteration 10: FWHM Before= 0.5 Hz, Target= 0.4 Hz, After= 0.5 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.543

shim changes: 
Z	-169
Z2	-111
Z3	+665
Z4	+4520
Z5	+3247
Z6	+388

duration = 4 min 52 sec
completed successfully
finished Tue Nov 09 10:05:56 2021


========================================================================
