
New TopShim run:

version = topshim 2.0.0
date = 2022-12-21
time = 08:59:10.194
command = topshim 

FINE SHIMMING

Parameters:

probe = Z104275_0392
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Iteration  1: FWHM Before= 0.5 Hz, Target= 0.3 Hz, After= 0.5 Hz
Iteration  2: FWHM Before= 0.5 Hz, Target= 0.3 Hz, After= 0.4 Hz
Iteration  3: FWHM Before= 0.4 Hz, Target= 0.3 Hz, After= 0.4 Hz
Iteration  4: FWHM Before= 0.4 Hz, Target= 0.3 Hz, After= 0.6 Hz
Iteration  5: FWHM Before= 0.6 Hz, Target= 0.4 Hz, After= 0.4 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.502

shim changes: 
Z	-37
Z2	-671
Z3	+28
Z4	-1289
Z5	+1667
Z6	-15680

duration = 3 min 9 sec
completed successfully
finished Wed Dec 21 09:02:17 2022


========================================================================
