
New TopShim run:

version = topshim 2.2.0
date = 2022-12-05
time = 12:57:26.663
command = topshim 

FINE SHIMMING

Parameters:

probe = Z151574_0146
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Iteration 1: FWHM Before= 1.5 Hz, Target= 0.4 Hz, After= 0.6 Hz
Iteration 2: FWHM Before= 0.6 Hz, Target= 0.2 Hz, After= 0.5 Hz
Iteration 3: FWHM Before= 0.5 Hz, Target= 0.4 Hz, After= 0.8 Hz
Iteration 4: FWHM Before= 0.8 Hz, Target= 0.4 Hz, After= 0.7 Hz
Iteration 5: FWHM Before= 0.7 Hz, Target= 0.5 Hz, After= 0.7 Hz
Iteration 6: FWHM Before= 0.7 Hz, Target= 0.4 Hz, After= 0.6 Hz
Slow convergence detected. Shimming was aborted.
Using the best result as the final shim state.

Lineshape quality factor (1D shimming, non-spinning) = 0.689

shim changes: 
Z	-75
Z2	-101
Z3	-107
Z4	+405
Z5	+334
Z6	-854
Z7	-1207
Z8	-2487

duration = 1 min 22 sec
completed successfully
finished Mon Dec  5 12:58:46 2022


========================================================================
