New TopShim run:

version = topshim 2.0.0
date = 2023-10-17
time = 17:44:24.395
command = topshim 

FINE SHIMMING

Parameters:

probe = Z104275_0392
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Iteration  1: FWHM Before= 3.0 Hz, Target= 0.4 Hz, After= 0.6 Hz
Iteration  2: FWHM Before= 0.6 Hz, Target= 0.3 Hz, After= 0.5 Hz
Iteration  3: FWHM Before= 0.5 Hz, Target= 0.3 Hz, After= 0.4 Hz
Iteration  4: FWHM Before= 0.4 Hz, Target= 0.4 Hz, After= 0.4 Hz
Iteration  5: FWHM Before= 0.4 Hz, Target= 0.4 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.471

shim changes: 
Z	-173
Z2	-202
Z3	-285
Z4	-991
Z5	-1213
Z6	-701

duration = 2 min 20 sec
completed successfully
finished Tue Oct 17 17:46:43 2023


========================================================================