New TopShim run:

version = topshim 2.0.0
date = 2022-04-06
time = 15:55:52.928
command = topshim 

FINE SHIMMING

Parameters:

probe = Z104275_0392
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
echo time must be reduced
Iteration  1: FWHM Before= 0.6 Hz, Target= 0.4 Hz, After= 2.3 Hz
Iteration  2: FWHM Before= 2.3 Hz, Target= 0.5 Hz, After= 1.4 Hz
Iteration  3: FWHM Before= 1.4 Hz, Target= 0.4 Hz, After= 1.9 Hz
Iteration  4: FWHM Before= 1.9 Hz, Target= 0.5 Hz, After= 1.9 Hz
Iteration  5: FWHM Before= 1.9 Hz, Target= 0.4 Hz, After= 3.7 Hz
Iteration  6: FWHM Before= 3.7 Hz, Target= 0.7 Hz, After= 3.0 Hz
Diverging behaviour detected. Shimming was aborted.
Using the best result as the final shim state.

Lineshape quality factor (1D spectrum, spinning) = 2.34

shim changes: 
Z	-395
Z2	-3585
Z3	-2454
Z4	-48505
Z5	-6997

duration = 3 min 18 sec
completed successfully
finished Wed Apr 06 15:59:09 2022


========================================================================