
New TopShim run:

version = topshim 2.0.0
date = 2022-04-05
time = 16:03:29.756
command = topshim 

FINE SHIMMING

Parameters:

probe = Z104275_0392
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Iteration  1: FWHM Before= 0.2 Hz, Target= 0.3 Hz, After= 0.3 Hz
Iteration  2: FWHM Before= 0.3 Hz, Target= 0.3 Hz, After= 0.7 Hz
Iteration  3: FWHM Before= 0.7 Hz, Target= 0.3 Hz, After= 0.6 Hz
Iteration  4: FWHM Before= 0.6 Hz, Target= 0.4 Hz, After= 0.3 Hz
Iteration  5: FWHM Before= 0.3 Hz, Target= 0.2 Hz, After= 1.4 Hz
Iteration  6: FWHM Before= 1.4 Hz, Target= 0.3 Hz, After= 0.7 Hz
Iteration  7: FWHM Before= 0.7 Hz, Target= 0.3 Hz, After= 0.5 Hz
Iteration  8: FWHM Before= 0.5 Hz, Target= 0.4 Hz, After= 1.1 Hz
shim changes: 
Z	-454
Z2	-2838
Z3	-438
Z4	-13820
Z5	-14299
Z6	-104580

duration = 4 min 37 sec
completed with failure
finished Tue Apr 05 16:08:05 2022


========================================================================
