
New TopShim run:

version = topshim 2.0.0
date = 2022-11-04
time = 08:51:26.474
command = topshim 

FINE SHIMMING

Parameters:

probe = Z104275_0392
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Iteration  1: FWHM Before= 1.1 Hz, Target= 0.4 Hz, After= 0.4 Hz
Iteration  2: FWHM Before= 0.4 Hz, Target= 0.3 Hz, After= 0.5 Hz
Iteration  3: FWHM Before= 0.5 Hz, Target= 0.3 Hz, After= 0.6 Hz
Iteration  4: FWHM Before= 0.6 Hz, Target= 0.3 Hz, After= 0.5 Hz
Iteration  5: FWHM Before= 0.5 Hz, Target= 0.4 Hz, After= 0.5 Hz
Iteration  6: FWHM Before= 0.5 Hz, Target= 0.4 Hz, After= 0.5 Hz
Iteration  7: FWHM Before= 0.5 Hz, Target= 0.4 Hz, After= 0.4 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.485

shim changes: 
Z	-149
Z2	-657
Z3	+66
Z4	-2460
Z5	-1634
Z6	-13407

duration = 4 min 7 sec
completed successfully
finished Fri Nov 04 08:55:32 2022


========================================================================
